The demolition of the British-era bridge, a crucial east-west connector that passes over railway tracks near the Prabhadevi ...
The British-era bridge passes over railway tracks catering to the Central and Western lines but is also surrounded by two ...
The bridge is being replaced by a two-deck structure, with the lower deck retaining east-west connectivity and the upper deck ...
3 天on MSN
Railway Minister Ashwini Vaishnaw has announced an allocation of Rs 23,778 crore for railway projects in Maharashtra as part ...
The LOWER PAREL branch of YES BANK is located in the GREATER BOMBAY district of the MAHARASHTRA State at Ground Floor, Lodha Supremus, Senapati Bapat Marg, Lower Parel, Mumbai 400013. The IFSC Code of ...
The 125-year-old Elphinstone Road Over Bridge (ROB), a key east-west connector built during the British era, will be closed ...
Why infra makes me infra-red The ‘I’ word is ego word. Sure, we’re building infra for a better tomorrow but, hey, it’s screwing up today. Plus, project pe project repeats that old song, ‘Manana, ...
Earlier, the MMRDA considered developing an underground corridor beneath the Parel-Prabhadevi railway tracks to avoid railway approval delays, but the concept was ultimately scrapped. It will be the ...
Even as the Mumbai traffic police are still mulling over logistics and dates of closure of arterial Elphinstone bridge, ...
Noting that the government has placed infrastructure development at the centre stage of its fiscal and public policy agenda, the Economic Survey 2024-25 stated that the addition to the length of ...
一些您可能无法访问的结果已被隐去。
显示无法访问的结果